Your calculated material quantities will appear here after you enter the project parameters and click "Calculate".
Calculate the required quantities of bitumen and aggregates for your pavement construction project. Enter your dimensions and mix properties for instant, accurate results.
Your calculated material quantities will appear here after you enter the project parameters and click "Calculate".
| Area (L × W) | — |
| Thickness (converted) | — |
| Mix Density Used | — |
| Bitumen Content | — |
| Estimated Total Cost | — |
This bitumen calculator will assist you to calculate how much bitumen you will need for a road, a spray job or a roof. Enter your length, width and thickness or switch to spray mode and enter your area and spray rate. The bitumen calculator provides you the answer in cubic meters, tonnes, litres and drums all at once so you can order the right amount first time. It’s working for contractors ordering asphalt by the ton, engineers checking a spec, and homeowners bidding a driveway job. Metric and imperial units are built in so it works no matter where your job is.
On this site you can find the exact formulas, density figures and spray rates you need for paving a driveway or laying a road, spraying a tack coat or waterproofing a roof. All of these numbers are things you can check by hand with a calculator, so you’re never just taking a black box’s word for it.
Bitumen is a black, sticky material that is derived from crude oil. It acts as a binder for road materials. bitumen calculator alone constitutes just approximately 4 to 7% by weight of a final road mix.
Asphalt is the finished mixture used in the construction of roads. This is a mixture of stone, sand and bitumen which is compressed to make a solid surface. This is the most common mistake individuals make when they seek a bitumen calculator. They generally mean ‘How much asphalt do I need?’ not ‘How much pure bitumen do I need?’. Both numbers are important thus this page explains both and the worked example below shows how they relate to each other.
You can also find comparable terms on supplier price sheets and spec docs: Hot mix asphalt (HMA) is asphalt that is laid hot and compacted while warm; bitumen emulsion is bitumen mixed with water so it may be sprayed cold; and penetration grade or viscosity grade (VG) numbers reflect how hard or soft the bitumen calculator is at different temperatures. You don’t have to know all of these to utilize this calculator, but it’s helpful for reading a supplier’s quote or a spec sheet.
Working out your bitumen quantity calculation takes three simple steps.
Volume = Length × Width × Thickness
Always convert every measurement to the same unit before you multiply. If your thickness is in millimeters, divide by 1,000 to get meters first. Mixing units is the number one cause of wrong orders.
Weight (t) = Volume (m³) × Density (t/m³)
Different materials have different densities. Use this table as your reference for bitumen calculator density (kg/m³) and related materials:
Material | bitumen density kg/m³ |
Pure bitumen | 1.01 – 1.06 |
Compacted hot mix asphalt | 2.30 – 2.40 (use 2.35 as default) |
Bitumen emulsion | approx. 1.00 |
The multiply bitumen calculator is used to calculate your final weight by 1.05 to 1.10 (5% to 10% additional). This covers spills, compaction losses, and tiny measuring errors on site. Skipping this step is one of the most typical reasons contractors run short mid-job and need an emergency second delivery.
Which percentage should you pick? For minor, uncomplicated works like a driveway on flat terrain, 5% is usually plenty. For larger works, jobs with uneven ground, or jobs where the crew is less experienced, use 10%. It’s cheaper to have a little excess material left over than to stop production and wait for a second truck.
You may also run this computation for irregular areas. Split the area into smaller rectangles, find out the volume for each one, put them together, then apply the density and waste stages to the combined amount. This is exactly how the gadget above handles L-shaped driveways or multi-section car parks.
Below is a step-by-step example of a complete asphalt tonnage calculator.
Suppose you are constructing a road 200 m in length and 7 m breadth with a layer of 50 mm depth.
So you’d order around 173 tons of asphalt for this job. This comprises around 8.2 tonnes of bitumen calculator binder.
If you are utilizing bitumen spray instead of laying asphalt, use the following formula for the bitumen spray rate calculator:
Area (m²) x Spray Rate (L/m²) = Litres
Different spray jobs have different rates. Quick reference:
Spray type Rate (L/m²)
Tack coat: .25 – .40
Prime coat: .65 – 1.30
Seal coat 0.8 – 1.5
Example of a worked tack coat: You have a parking lot of 1,400 m² to spray at 0.30 L/m².
1,400 x 0.30 = 420 liters
Bitumen comes in 200-liter drums; thus, you would need 3 drums (capacity 600 L) to do this work with a little left over.
A tack coat calculation is a light thin spray used between an old surface and a new coat of asphalt to make the two layers stick to each other. The first asphalt layer is put on an untreated base such as compacted gravel after a prime coat is sprayed, which requires a heavier spray rate because the ground absorbs more liquid. The seal coat is the thickest of the three and is applied to a finished surface to protect it from water and UV damage.
The selection of the correct rate within each range depends on the surface. The lower end of the range will be used where a smooth, thick, well-compacted surface will require less bitumen. Use the top end for tough, porus or older cracked surfaces. Most pavers will run a short patch and assess how much the surface absorbs before committing to a pace for the complete job if in question.
For roofing and waterproofing jobs the rule of thumb is different: 1.5 to 2.0 kg/m² per coat and most jobs require two coatings.
Worked example of roof: 2 coats for 120 m² flat roof @ 1.8 kg/m² each coat:
120 × 1.8 × 2 = 432kg bitumen coating required
Make sure you check the coverage rate on the label of your specific product, as roofing bitumen products vary by brand and formulation.
Standard practice is two coats, as a single coat rarely gives even coverage without gaps. The first layer fills small cracks and pores in the surface, the second coat gives you a uniform, impenetrable covering on top. Some standards require a third coat or a reinforcement membrane between coats on larger commercial roofs so always check your project requirements before ordering material.
If you are working with a slanted roof instead of a flat one, take the actual surface area along the slope rather than the level footprint of the building. The roof is steeply pitched and has a lot more surface area than the footprint on the ground thus you will be short on material if you choose the flat footprint.
Quick Reference: Conversions & Coverage
Save these numbers for rapid site checks:
For planning recommendations not covered by this calculator, the specifications of national road authorities are the best reference. In the US, the Asphalt Institute provides recommendations for mix design and application. In the UK, Highways England (National Highways) is responsible for specifying road works. Austroads publishes pavement design guides, which are utilized throughout Australia and New Zealand. These bodies define the exact criteria for public road contracts, and the defaults of this calculator (2.35 t/m³ compacted asphalt density, 5% bitumen content, 5–10% waste) reflect industry-wide figures that are generally used, not a specific project spec.
Three bitumen calculator uses for getting your bitumen order right are consistent units, the correct density for your material and an acceptable waste allowance. Whether you’re building a road, putting down a tack coat, or waterproofing a roof, it’s the same three-step process each time. Run your figures through the calculator above, then double check them by hand with the formulas on this page before you place your order.
This calculator provides planning estimates based on common density and average spray rates. Public road works shall meet your project specifications and local road authority norms. The values used here are the defaults (2.35 t/m³ for compacted asphalt, 5% bitumen content, 5-10% waste allowance) and are common in the industry; check the exact numbers with your project’s mix design and supplier documentation.
Calculate the volume (length x breadth x thickness) and multiply by the density for the weight. Allow for 5-10% waste. For example, a layer of 70 m³ at 2.35 t/m³ will get you around 164.5 tons of asphalt.
Approximately 970 – 990 liters, depending upon temperature and grade. This is based on the density of bitumen of around 1.01–1.06 t/m^3.
Asphalt contains 4 to 7 percent bitumen by weight. That means when you purchase asphalt, only a small percent of the weight is the binder itself.
50 mm thick, approximately 8.5 m² Thicker layers mean less area per tonne. Thinner layers mean more.
It is usually between 0.25 and 0.40 L/m² depending on the texture of the surface. A higher rate is needed for rougher or more porous surfaces.
Yes. Hot bitumen has a small expansion, i.e., its volume changes with temperature, although the weight remains the same. So, for the sake of avoiding confusion from variations in temperature, major works are normally ordered by weight (tonnes) rather than by volume (liters).
Sign in to your account